Installation Procedure
Preparation for Installation on Upstream Connection Machine Side
1) .Remove two covers.
6
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side
2) Secure the two bundled clamp plates and positioning pin to the host machine
each with two bundled RS tight screws(M4 x 8).At this time,secure the supplied
ground plate along with the rear latch catch.
x6
F-6-6
F-6-6
6
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side
F-6-7
F-6-7
6-7
6-7