Installation Procedure; Preparation For Installation On Upstream Connection Machine Side - Canon K1 Service Manual

Hide thumbs Also See for K1:
Table of Contents

Advertisement

Installation Procedure

Preparation for Installation on Upstream Connection Machine Side

1) .Remove two covers.
6
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side
2) Secure the two bundled clamp plates and positioning pin to the host machine
each with two bundled RS tight screws(M4 x 8).At this time,secure the supplied
ground plate along with the rear latch catch.
x6
F-6-6
F-6-6
6
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side
F-6-7
F-6-7
6-7
6-7

Advertisement

Table of Contents
loading

Table of Contents