Check of settings - contiuned
17. Repeat the settings for the other Digital inputs
18. Select Utility meter
19. Overview for Utility meter
20. Move on to common settings for utility meter
21. Move on with settings for Utility meter 1
22. Repeat the settings for the other utility meters.
23. The control of the settings has been completed.
58
RS8FR302 © Danfoss 2015-08
Here you must define the common data for the synchronisation.
Period is the expected time between two synchronisation signals.
A new period starts when the synchronisation signal is received or
when the period expires.
If no synchronisation signal is connected, the calculations will be based
on the start of each period. (Without synchronisation the readings will
be displaced and cannot be directly compared with electricity company
readings).
Do not enable the function until the whole function has been defined
(settings can only be defined when the function has stopped).
Specify the unit of measure. KWh when measuring current, m3 when
measuring gas.
Also define:
- How many pulses are to be received for each unit of measure.
- Any necessary scaling.
- Any reset (or other start value) of the display.
The measurement can be monitored in the five fields. These display
the total consumption, the current load and the average load over the
period of time.