Shipment For Service; General Safety Considerations - Keysight Technologies PNA Series Installation And Getting Started Manual

Network analyzers
Hide thumbs Also See for PNA Series:
Table of Contents

Advertisement

In This Guide
Safety, Regulatory, and Environmental Information
Safety, Regulatory, and Environmental Information
Maintenance
To remove dirt or dust from the external case of the network analyzer, clean
the case using a dry or slightly-dampened cloth only.
To prevent electrical shock, disconnect analyzer from mains before
cleaning. Use a dry cloth or one slightly dampened with water to
clean the external case parts. Do not attempt to clean internally.

Shipment for Service

Contact Keysight Technologies for instructions on where to ship the analyzer
for service. Refer to "Getting Assistance from Keysight" on page 4.
Ship the analyzer using the original packaging materials. Shipping the analyzer
in anything other than the original packaging may result in non-warranted
damage.
Safety Symbols
The following safety symbols are used throughout this manual. Familiarize
yourself with each of the symbols and its meaning before operating this
instrument.
Denotes a hazard. It calls attention to a procedure that, if not correctly
performed or adhered to, would result in damage to or destruction of the
product. Do not proceed beyond a caution note until the indicated
conditions are fully understood and met.
Denotes a hazard. It calls attention to a procedure which, if not
correctly performed or adhered to, could result in injury or loss of
life. Do not proceed beyond a warning note until the indicated
conditions are fully understood and met

General Safety Considerations

Safety Earth Ground
The Mains wiring and connectors shall be compatible with the connector
used in the premise electrical system. Failure to ensure adequate earth
grounding by not using the correct components may cause product
damage and serious injury.
Installation Note E8356-90001
31

Advertisement

Table of Contents
loading

Table of Contents