Step 1. Check The Shipment; Step 2. Meet Requirements - Keysight Technologies PNA Series Installation And Quick Start Manual

Network analyzers
Hide thumbs Also See for PNA Series:
Table of Contents

Advertisement

In This Guide
Installing Your Analyzer

Step 1. Check the Shipment

1. Unpack the contents of the shipping container. Keep the packaging
More than one person is required to safely lift or carry this instrument.
Alternately a mechanical lift can be used to eliminate the risk of personal
injury.
The PNA is shipped with ESD-safe protective end caps on the test ports,
impact covers, and metal covers for the front-panel jumpers. Save these
items for reuse to ensure shipment safety of the PNA.
2. Carefully inspect the analyzer to make sure that it was not damaged
3. Use the Contents List in the shipping container to verify the completeness

Step 2. Meet Requirements

Before installing the PNA on a bench top or in an equipment rack, first make
sure that the electrical and environmental requirements of the location are met.
– This instrument has an autoranging line voltage input. Before switching
on the instrument, be sure the supply voltage is within the specified range
and voltage fluctuations do not exceed 10 percent of the nominal supply
voltage.
– Condensing humidity operating conditions are not allowed. Refer to
"Environmental Information" on page
– The instruments can operate with mains supply voltage fluctuations up to ± 10%
of the nominal voltage.
1. Ensure the available AC power source meets the following requirements:
Mains Supply Voltage
100/120 VAC
220/240 VAC
Installation Note E8356-90001
material in case the analyzer needs to be returned to the factory.
during shipment. If damaged, refer to
of your shipment. If not complete, refer to
page
4.
"Contacting Keysight" on page
"Contacting Keysight" on
26.
Frequency
50/60/400 Hz
50 /60 Hz
4.
Power
575W MAX
575W MAX
11

Advertisement

Table of Contents
loading

Table of Contents