Datex-Ohmeda F-LM1 Technical Reference Manual page 333

Light monitor
Table of Contents

Advertisement

1
INTRODUCTION
This guide describes how to install the mainstream CO
F-LM1 and F-LMP1. The mainstream CO
measurement capability.
1.1 Installation time
Approximately one to one and a half hour.
1.2 Tools needed
Cross head screwdriver and pliers.
1.3 Parts needed
891133
891134
893373
304511
617210
640445
902401
628703
Optional N-LCM Upgrade for Light Monitors, F-LM1 and F-LMP1
Patient connector plate
Patient connector plate
Co2/mainstream assembly
EMI-filter (ferrite ring for flat cable)
Cross cyl.-head screw M3x6 tufflock
Insulate nylonpost, 13x6.5, M3 Male/Female
Flex cable
Connector panel, F-LM1
Connector panel, F-LMP1
Cross cyl.-head screw M3x10 tufflock
measurement upgrade set for Light Monitors,
2
measurement upgrade set provides mainstream CO
2
2
1 pc
1 pc
1 pc
1 pc
3 pc
1 pc
1 pc
1 pc
1 pc
2 pc
Document No. 896551-2
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

S/5 seriesF-lmp1

Table of Contents