B Roller; Removing And Replacing The B Roller; Checking The Guide Shoes - Kodak M6B Service Manual

Rp x-omat processor
Table of Contents

Advertisement

B Roller

Removing and Replacing the B Roller

[1]
Remove the ROLLER from the SHAFT. Pull
the BEARING with the SHAFT.
[2]
Install the ROLLER onto the SHAFT.
[3]
Check that the CHAIN has the correct tension.
See Figure 18.

Checking the Guide Shoes

[1]
Check that the LONGER TIPS, are in the
direction of film travel. See Figure 17.
LONG
TIP
Figure 17 Checking the Guide Shoes
2-14
GUIDE
SHOE
SHORT
TIP
H048_0155CCB
H048_0155CA
CHAIN
Figure 18 Checking the Tension of the Chain
H048_0125CCD
H048_0125CA
246628

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents