N5292A Option 200 2-Port Cable Connections - Keysight Technologies PNA Series Installation Manual

2-port and 4-port microwave network analyzer system (900 hz - 110 ghz / 900 hz - 120 ghz)
Table of Contents

Advertisement

System Installation
PNA, Controller, and Test Head Module Interconnections
N5292A Option 200 2–Port Cable Connections
Figure 3-15
Cable Connections for Two Test Heads Module
Figure 3-16
Cable Two Test Heads N5293/5AX03 to the N5292A. (Attach heads and
torque cable screws to 8 in-lbs.)
3- 20
Torque cable screws to 8 in-lbs
Keysight N5290/1A Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pna-x seriesN5290aN5291a

Table of Contents