System Installation
PNA, Controller, and Test Head Module Interconnections
8. Remove semirigid cables from SOURCE OUT to CPLR THRU. Refer to
9. Connect 50 ohm terminations to CPLR THRU ports (1810-0818). Refer to
Figure 3-6
Remove Semirigid Cables and Connect 50 termination to the CPLR THRU
Ports
Keysight N5290/1A Installation Guide
Figure
3-6.
Figure
3-6.
3-11