Installation Procedure - Electrical - Avery Dennison SNAP 500 User Manual

Hide thumbs Also See for SNAP 500:
Table of Contents

Advertisement

98
Installation Procedure – Electrical
All manuals and user guides at all-guides.com
1) Facing the back of the Printer, remove the pre-punched material from the
horizontal slot (shown below) in the Mother Board Mounting Plate.
2) Assemble Internal Verifier Cable into slot and secure with hardware supplied
on 581129.
3) Mount J1 (5 wire, 10 pin connector) to MCB J7. Mount J2 (3 wire, 10 pin
connector) to MCB J11.
4) Assemble External Verifier Lead Connector to mating Connector in internal
cable (Installed in step 2) & mating Connectors to top of Verifier.
User's Manual—SNAP™ 500 Printer
KNOCK OUT PRE-PUNCHED SLOT
INTERNAL VERIFIER CABLE

Advertisement

Table of Contents
loading

Table of Contents