Preparing The Machine; Installation; Unpacking Of The Unit; Connection Of The Machine - Avery Dennison ALX 720 User Manual

Fully automatic print and apply machine
Hide thumbs Also See for ALX 720:
Table of Contents

Advertisement

Operators Manual
ALX 720

3. Preparing the machine

3.1 Installation

3.1.1

Unpacking of the unit

Before removing the unit off the box, don't hold the machine on the dispensing edge, printer
unit to prevent disadjustment off the machine.
For mounting the machine, a complete system of holding tools is available. Ask your Avery
representative.
Take care that the machine is safe and stable mounted.
There are rotating parts on the machine. Do the necessary actions to prevent that anybody
can be caught from these parts.
3.1.2

Connection of the machine

Before connecting the machine to the mains, check the correct setting of the line voltage. For
the connection of sensor, applicators e.g. see the chapter connections. Fix all cables to prevent
accidents and damaging of cables. Have also a look to the EMI chapter for proper machine
operation.
For checking of correct operation of sensors, applicators use the check functions SCHK, I_CH
and O_CH.
3.1.3

General setting

Normally the setting is done, but before operation check and note the general dispenser
configuration: dispenser direction, machine type, applicator mode, and APSF function.
The printer function IFAC / PORT has to be set to RS23.
4/09
Page 17
Preparing the machine

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents