Warm-Up Time - Sartorius Cubis Series Operating Instructions Manual

Electronic semimicro, micro, precision and analytical balances
Hide thumbs Also See for Cubis Series:
Table of Contents

Advertisement

R
L
R
L
L
R
12
9
6
Leveling the Balance, Setting the Level Indicator
h
Leveling the balance compensates for slant or unevenness at the place
of installation� The balance must be perfectly horizontal to ensure
consistent, reproducible weighing results� All models are equipped with
an electronic tilt angle detection feature� If the balance is not level,
a warning symbol
leveling is available on models with motorized leveling feet� For models
with manual leveling feet, please follow the instructions on the display:
see "Leveling the Balance with the Inclination Sensor�"
Leveling the Balance Manually
The balance is leveled using both front leveling feet�
t
Screw in both back leveling feet (only for models with back leveling feet)�
t
Turn the two front feet as shown in the illustration until the air bubble is
t
centered within the circle of the level indicator�
y Normally, several leveling steps are required�
Screw out both back leveling feet until they touch the setup surface
t
(only for models with back leveling feet)�

Warm-up Time

y In order to deliver the precise results described in the Technical Specifications,
the balance must warm up for at least 30 minutes after initial connection to
2
the power supply� Only after this time will the device have reached the required
3
operating temperature�
When a verified balance used in legal metrology (legal-for-trade
applications) is connected to the power, it must warm up for at least
two hours before operation�
is shown on the display� Push-button automatic
Cubis MSE Operating Instructions
Getting Started
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents