Transport; Unpacking And Preparing The Boiler - REMEHA Gas 120 ACE Series Installation And Service Manual

Floor-standing condensing gas boiler
Hide thumbs Also See for Gas 120 ACE Series:
Table of Contents

Advertisement

5 Installation
Fig.12
5.3

Transport

5.4

Unpacking and preparing the boiler

Fig.13
1 1
24
Gas 120 ACE
1 2
MW-6000736-01
Transport the boiler pallet with a manual or electric pallet truck.
Caution
Wear gloves to handle the boiler.
Transport the boiler pallet with a manual or electric pallet truck.
Use carrying bars (not provided) to move the boiler.
Important
To fit the boiler, position the pallet with the package 2.5 m in front
of the desired location for the installation. This distance is required
to allow the boiler to be removed from its pallet.
1. Cut the packaging.
2. Remove the packaging from the boiler but leave the boiler on the
shipping pallet.
Important
The documentation bag (user manual + accessories) is contained
in the protective block.
MW-3000014-2
7717202 - v03 - 24062019

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gas 120 ace - 65Gas 120 ace - 90Gas 120 ace - 115

Table of Contents