5.
Start-up
Drain valve (optional)
Fig. 10c: The drain valve [2] is installed into the floorpan
opening [1] at the floor at the left front area of the sample
chamber.
NOTE – Installation
The optional drain valve must be installed only
by authorized service personnel.
WARNING – Drain valve lock!
To prevent contaminated liquid from being
accidentally drained from the floorpan, the
drain valve must be secured using a
conventional padlock.
5.3
Levelling the cabinet
The cabinet should be levelled only after it has been
positioned.
1. Remove transport protection (foil) from the workplate or from
the workplate segments.
2. Lift the workplate or the workplate segments by the wire
hooks and place it/them onto the front and rear rails in the
sample chamber with the wide line of holes facing forward.
3. Device without stand: Place a bubble level onto the
workplate and align the substructure until the bubble level
indicates an exactly horizontal position in all directions.
4. Device with stand: Place a bubble level onto the
workplate and use the four levellers of the stand to effect
a level state in all planes.
When adjusting the device stand height, proceed from right
to left and from rear to front.
Operating Instructions Safety Cabinet Safe 2020 / Maxisafe 2020
Fig. 10c
Drain valve installation
27