Annex 2: Installation and System Turn ON Progress List
Tick after
No.
completion
1
2
3
4
5
6
7
8
9
10
11
The environment is meeting all technical requirements.
3.3.1
Cleaning
3.3.2
Temperature
3.3.3
Radiating System
3.3.4
Heating System
3.3.5
Fire-extinguisher System
3.3.6
Grounding System
Battery
rack
is
requirements.
Control Module (BMS) and Battery Module are installed
well.
The MBMS are installed well. (If configured.)
Connect External Power Cable +/- between each BMS
to the PCS or confluence cabinet.
Connect power cables of each battery string.
Connect communication cables of each battery string.
Set up ADD switch of every BMS and the MBMS (Address
Assignment).
Connect external communication cables from BMS to
BMS, MBMS, inverter, PCS or another.
Connect the communication cable from MBMS to the
PCS.
Double check every power cables, communication
cables installed well. And ADD Switches are setting
right.
Item
installed
follow
the
25 / 27
Remark
Refer to chapter
3.3
technical
Refer to chapter
3.5.3.
Refer to chapter
3.5.4.
Refer to chapter
3.5.5.
Refer to chapter
3.6.2.
Refer to chapter
3.6.2.
Refer to chapter
3.6.2.
Refer to chapter
3.6.3.
Refer to chapter
3.6.2.
Refer to chapter
3.6.2.
Refer to chapter
3.6.2 and 3.6.3.
18PIHV0802
Need help?
Do you have a question about the PowerCube-H1 and is the answer not in the manual?
Questions and answers