Handling And Placement - Pylontech PowerCube-H1 Operation Manual

Lithium-ion phosphate energy storage system
Hide thumbs Also See for PowerCube-H1:
Table of Contents

Advertisement

External Battery CAN
Communication Cable (direct)
External Power Cable +
External Power Cable -
For external power supply control module there is an additional AC power cable:
AC Power Cable (Australia
Standard)

3.5 Handling and placement

Warning: The battery rack is IP00. It must be installed in a restricted access area;
Warning: PowerCube-H1/H2 is a high voltage DC system, operated by qualified and authorized
personnel only.
Black/3.5m/Super 5th Class
Twisted-pair Wire/2 RJ45 terminal
Orange/2m/4AWG/SURLOK
Terminal/25-8 Terminal
2000
Black/2m/4AWG/SURLOK
Terminal/25-8 Terminal
2000
Black/2.5m/3*0.75mm2/Australia
Standard
9 / 27
pcs
1
pcs
1
pcs
1
pcs
1
18PIHV0802

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powercube-h2Powercube-x1

Table of Contents