UPS5000-E-(25 kVA-125 kVA)-FM
User Manual
Figure 3-40 Connecting signal cable
----End
Scenarios With a Cable Entry Cabinet
Route cables for the UPS from inside out and from bottom up.
Step 1 (Optional) Determine the installation position for the cable entry cabinet, and mark mounting
holes at the installation position based on drawings.
Issue 02 (2017-10-23)
The number and colors of signal cables in the figure are for reference only.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Installation
74