UPS5000-E-(25 kVA-125 kVA)-FM
User Manual
Figure 3-37 Connecting the ground cable
Step 4 Route power cables. Route the battery cable and output power cable along the right side of the
cabinet, input power cable along the left side of the cabinet, and route the cables through the
gap between inner and outer beams of the rack.
For dual mains, remove the copper bar between mains and bypass input terminals, as shown
in
Figure
Issue 02 (2017-10-23)
Dual mains
3-29.
Use routing cables by removing small covers as an example.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Installation
71