ABB ACF5000 Manual page 38

Multi-component ftir analyzer system
Table of Contents

Advertisement

38
Gas connections of PFE2 Filter unit
ACF5000 FTIR ANALYZER SYSTEM
16
17
15
14
13
12
11
10
Pilot valve for cleaning filter -Y2.1
1
Diaphragm valve for cleaning filter -Y2.2
2
Pilot valve for pulsed instrument air -Y1.1
3
Diaphragm valve for pulsed instrument air -Y1.2
4
Connection for instrument air (max. 6 bar) bulkhead fitting 12 mm
5
Connection for test gas bulkhead fitting 6 mm
6
Connection for control air (max. 6 bar) bulkhead fitting 6 mm
7
8
Connection for Pt100
Heated sample gas line
9
10
Power supply
Heated cutoff valve -Y5 (option)
11
12
Solenoid valve for venting -Y4
Diaphragm valve for cleaning filter surface and probe tube -Y3.2
13
14
Pilot valve for cleaning filter surface and probe tube -Y3.1
Protective case for the probe
15
16
Terminal box
Filter unit
17
18
Check valve
Connection for back-purging filter G½ to 12 mm pipe coupling
A
Connection for back-purging filter surface and probe tube
B
G½ to 12 mm pipe coupling
Sample gas outlet G¼ to 6 mm pipe coupling
C
D
Test gas connection G¼ to 6 mm pipe coupling
|
OI/ACF5000-EN REV. A
18
D
B
A
C
1
2
3
4
5
6
7
8
9

Advertisement

Table of Contents
loading

Table of Contents