ABB ACF5000 Manual page 185

Multi-component ftir analyzer system
Table of Contents

Advertisement

No.
Text
512
Automatic adjustment in pro-
gress.
513
System bus communication
disrupted during automatic
adjustment.
514
External adjustment started.
515
External adjustment ended.
516
External adjustment in pro-
gress.
517
Device is being serviced.
518
The adjustment could not be
carried out, because the meas-
ured value is instable.
519
Pre-amplifier overrun error: The
adjustment could not be car-
ried out, because the
pre-amplifier is overdriven.
520
Basic adjustment zero point
started.
521
Basic adjustment zero point
ended.
522
Basic adjustment zero point
canceled.
523
Basic adjustment zero point
incomplete. System bus com-
munication disrupted during
adjustment.
524
Basic adjustment zero point in
progress.
525
Linearization not possible: The
linearization provides no valid
result. Measured value may be
imprecise. Check center point
gas.
526
Linearization not possible: The
linearization could not be car-
ried out, as the identification
line is not linear.
527
Basic adjustment for compo-
nent:
528
Automatic adjustment could
not be started, as the adjust-
ment was manual.
529
The adjustment was canceled,
as no raw measured values can
be entered.
530
The adjustment was canceled,
as the pressure switch did not
detect adjustment gas.
531
Auto validation started.
532
Auto validation ended.
ACF5000 FTIR ANALYZER SYSTEM
S A W F Reaction/Comment
x for information; not in the logbook
for information
for information
x for information; not in the logbook
x for information, e.g. during a manual adjustment; not in
the logbook
for information
for information
for information
for information
x for information; not in the logbook
see message text
see message text
for information
for information
x
x
x
x
for information
for information
|
OI/ACF5000-EN REV. A