ABB ACF5000 Manual page 45

Multi-component ftir analyzer system
Table of Contents

Advertisement

Connecting the electrical leads
Connecting the signal lines
ACF5000 FTIR ANALYZER SYSTEM
Provide the material required for the installation (see page 31).
Observe "Arrangement diagram", "Wiring diagram" and "Terminal dia-
gram" in the system documentation.
The cable glands for the electrical leads are located in the right-hand
cabinet wall.
When laying the electrical leads, observe the relevant national safety
regulations for installing and operating electrical systems.
Lay the signal lines separately from the power supply lines.
Lay analog and digital signal lines separately from each other.
Carefully plan the combination of signal lines in cables, including for the
purpose of feeding through the cable glands.
Connect signal lines to the terminal blocks on the I/O modules at the
rear wall.
Lay the screen of the screened cable in accordance with the local regula-
tions. In doing so, consider the potential differences and interspersion
of interference signals.
|
OI/ACF5000-EN REV. A
45

Advertisement

Table of Contents
loading

Table of Contents