Electrical Connection - Festo CHB-C-N Manual

Checkbox compact
Hide thumbs Also See for CHB-C-N:
Table of Contents

Advertisement

2. Mounting and commissioning
2.3

Electrical connection

1
Reserved for
Festo service
2
Buffer/Feeder
3
Actuators
4
Encoder
5
24 V DC
6
PLC
7
Ethernet
8
FE
Fig. 2/4: Connections of the Checkbox
Function
1
– Connection for Festo Service
2
– Connection of 1 buffer zone sensor for controlling the flow of parts to the next
machine
– 24 V power outputs for controlling the supply system (small parts conveyor) and
the transport system (transporting device)
3
– 24 V power outputs for controlling a maximum of 3 actuators for sorting out the
tested conveyed parts
4
– Connection of a rotary pulse generator for determining the speed of the conveyor
system with increased demands for length accuracy
5
– Connection for the 24 V DC operating voltage
6
– Connection of 2 buffer zone sensors for controlling the flow of parts to the next
machine
– 24 V power output for controlling the supply system (small parts conveyor) and
the transporting device
– I/O signals for process monitoring and higher-order control or for controlling a
downstream-switched machine
Festo GDCA-CHB-C-N en 1508e English
3 4 5
1
2
6 7 8
Chapter
3.3
3.2
3.5
2.3.2
3.6
2-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents