Start up

5.2.2 Pneumatic port of application module

Pneumatic port is done on the principle of the following sketch. The application module is connected from
the valve terminal to the on-off valve at the conveyor. You only have to plug the tube (nominal size 4) into
the QS plug.
Pneumatic connection of the application module

5.2.3 Electrical connection of application modules

See design and Function

5.3 Visual inspection

Visual inspection must always be done before starting up!
Before starting the station, please check:
the electrical connections
the correct fit and condition of the supply ports
the mechanic components regarding visible faults (cracks, loose connections etc.)
the function of the Emergency Stop
Please make sure that all damages discovered are removed before starting the station!