6 Installation and startup
Initial startup
Condensate warning (AU)
26
6.4.6
Switching the units on
CAUTION: Do not put the unit into operation at low
temperatures!
If you move the unit to the operating site from a cold environment,
condensation may form and result in a short circuit.
Install the unit at room temperature.
Wait until the unit has reached room temperature and is absolutely dry
(for at least one hour)
The unit is dry and can be put into operation.
If the acquisition unit is switched on at the mainswitch, then it can be switched
on at the ON button. The monitor is switched on and off automatically (if it
was switched on before the acquisition unit was switched off).
At theyou can switch on and off with themonitor ON/OFF switch.
A
Monitor ON/OFF switch
B
ON button
1.
Switch the acquisition unit on at the main switch.
2.
Switch the acquisition unit on at the ON switch.
CAUTION: Possible data loss and PC malfunction:
Switching the exposure unit off at the ON button during operation may cause
data loss and PC malfunctions.
Always switch the unit off as described in the chapter "Switching the
units off".
3.
Switch the monitor on.
Sirona Dental Systems GmbH
Operating Instructions for the Acquisition Unit CEREC 3
A
C
Main switch
D 3344.201.01.25.23 01.2011
B
C
63 22 700 D 3344