HEIL DuraPack 5000 2017 Operation Manual page 159

High-compaction rear loader.
Table of Contents

Advertisement

COMPONENT/SYSTEM
Operator Controls
Front Mount Pump or Power Take-Off
(PTO)
Grease Fittings
Body Undercoating
Fork Bearing Block Bolts (Half/Pack
Models Only)
* Daily = 8 hrs. Weekly = 40 hrs. Monthly = 200 hrs. 6 Months = 1000 hrs. Yearly = 2000 hrs.
Issued September 2017
Preventive Maintenance Chart
DuraPack
*HOURS OF OPERATION
8
40
200
®
®
5000
1000
2000
CHECK/SERVICE
Check seals for leaks and operation.
Replace if necessary
Check drive line for smooth operation.
Replace as necessary.
Check set screws for tightness.
Tighten as necessary.
Make sure keys are in place.
Replace if necessary.
For greaseable PTOs (non-wet spline),
remove the pump's bolt flange about 2
inches from the PTO and apply grease to
female pilot of PTO pump flange. Failure to
lubricate female pilot of PTO as given may
cause damage to the pump shaft. Greasing
is NOT required on wet spline PTOs such
as the Chelsea 890/897 series.
Lubricate as shown on Body Lube Chart.
Inspect body undercoating and repair as
necessary.
Each of the four fork bearing block bolt
torques should be 460 Ft-Lbs.
For Odyssey models only, calibrate cylinder
sensors. See Service Manual - Odyssey
Cylinder Sensors Calibration.
151
Copyright 2017, Heil Environmental
Printed in U.S.A.