Step 2-Measure & Connect The Primary Power; Step 3-Connect Pc To The Mds Entranet 900; Step 3-Connect Pc To The Transceiver - Microwave Data Systems MDS entraNET 900 System Manual

Wireless ip/ethernet
Table of Contents

Advertisement

78
MDS entraNET 900 System Guide (Preliminary)
3.3 STEP 2—MEASURE & CONNECT
THE PRIMARY POWER
The primary power at the transceiver's power connector must be within
10.5–30 Vdc and be capable of continuously providing a minimum of 8
Watts. (Typical power consumptions are: 760 mA @ 10.5 Vdc, 580 mA
@ 13.8 Vdc, and 267 mA @ 30 Vdc.) A power connector with
screw-terminals is provided with each unit. Strip the wire leads to 6 mm
(0.25"). Be sure to observe proper polarity as shown in
the positive lead (+) on the left.
NOTE: It will take about 30 seconds for the transceiver to power up
and be ready for operation.
Lead
Binding
Screws (2)
Figure 3-2. Power Connector, Polarity: Left +, Right –
The transceiver must be used only with nega-
CAUTION
tive-ground systems. Make sure the polarity of the
POSSIBLE
power source is correct. The unit is protected from
EQUIPMENT
reverse polarity by an internal diode and fuse.
3.4 STEP 3—CONNECT PC TO THE
MDS TRANSCEIVER
Connect a PC's Ethernet port to the
over cable. The
LED should light. Alternately, you can use a serial
LAN
cable to connect to the
Invisible place holder
port using an Ethernet cross-
LAN
port.
(Figure 3-3 on Page
COM1
Figure 3-2
with
Wire Ports
81)
MDS 05-4055A01, Rev. A

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MDS entraNET 900 and is the answer not in the manual?

Questions and answers

Table of Contents