Multiload Ii Flow Meter And Control Valve Wiring - Toptech MultiLoad II DIV-2 Installation Manual

Flow controller
Table of Contents

Advertisement

5.4.1

MultiLoad II Flow Meter and Control Valve Wiring

I/O DIGITAL/
I/O 2 METER
ANALOG
METER 0
IO_DA TB1
IO_2M TB3
IN 10
PORT 0 OUT 5
PORT 0
OUT 9
PORT 1 OUT 4
IN
8
PORT 2 OUT 3
PORT 1
OUT 7
PORT 3 OUT 2
IN
6
LINE
IN
1
PORT 2
OUT 5
IN
4
PORT 3
OUT 3
IN
2
PORT 8
OUT 1
IO_DA TB2B
IO_2M TB7
1
1
+
+
PORT 4
PORT 4
2
-
2
-
+
3
()
+
3
()
PORT 5
PORT 5
-
4
()
-
4
()
+
5
+
5
PORT 6
PORT 7
-
6
-
6
+
7
PORT 7
-
8
+
9
PORT 9
-
10
IO_DA TB2A
IO_2M TB6
+
+
1
1
+
2
+
2
12Vdc
-
3
+
3
-
4
+
4
+
5
12Vdc
-
6
-
7
-
8
9
-
10
-
Caution: Line voltage used to drive the Digital Valve Solenoids MUST be controlled by the Ground or Overfill monitor. In the event of a Ground loss or
Overfill detection, this voltage must be switched off to ensure a failsafe shutdown of the product flow.
METER 1
IO_2M TB2
PORT 0 OUT 5
PORT 3
PORT 3.IN/
PORT 1 OUT 4
LINE.IN
PORT 2 OUT 3
PORT 3.OUT
PORT 3 OUT 2
LINE
IN
1
PORT 2
PORT 2.IN/
LINE.IN
PORT 2.OUT
IO_2M TB8
1
+
PORT 4
-
2
PORT 4
+
3
()
PORT 4.+
PORT 5
+
-
4
()
PORT 4.-
+
5
A
-
PORT 7
-
6
PORT 5
PORT 5.+
90°
+
PORT 5.-
B
-
IO_2M TB6
+
1
+
2
12Vdc
-
3
-
4
+
12V
5V
-
15A
L
N
L
N
&
VCC
A
A
B
B
GND
L
N
36

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MultiLoad II DIV-2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Rcu ii div2

Table of Contents

Save PDF