Starting The Flow Delivery And The Baseline Monitoring; Creating A Program File - Using The Wizard; Creating A Program- An Example - LC Packings SWITCHOS II User Manual

Advanced microcolumn switching unit
Table of Contents

Advertisement

Software Control
b) Use on the Save as... command on the File menu to save this new
assignment.
4.3.4
To gain control of the different Ultimate modules, each module of the
configuration need to be connected to the control panel. Check the Connect
boxes to connect the individual modules (item 1; FIGURE 4-8).
FIGURE 4-8
Flow delivery and baseline monitoring can now be started. Enter the column and
the trap column flow rates in the Flow fields in the corresponding boxes (item 2;
FIGURE 4-8) and click on the blue circle in the toolbar to start baseline
monitoring (item 3; FIGURE 4-8).
4.3.5
CHROMELEON programs are text files and modifying a program is normally done
by editing in the text window. When creating a new program file, a Program
Wizard starts automatically and guides you through the programming to simplify
the procedure. Enter the required information; in most cases the pre-defined
values can be used.
The wizard provides a ready-to-use program based on your entries, without the
need to type a special programming syntax. Press the F1 key for additional help
and more detailed information. Section 4.3.6 provides a programming example.
4.3.6
The following section provides information how to program the flow rate of the
loading pump and how to use the switching valves.
4-8
Starting the Flow Delivery and Baseline Monitoring
3
1
2
1
1
2
The Control Panel for UltiMate, FAMOS and Switchos
Creating a Program File – Using the Wizard
Creating a Program – An Example
1
D850R3
User's Manual Switchos II

Advertisement

Table of Contents
loading

Table of Contents