Execution Of Data Link; Confirmation Of Operation By Led Indication - Mitsubishi FX3U User Manual

Melsec-f, cc-link v2
Hide thumbs Also See for FX3U:
Table of Contents

Advertisement

FX
-16CCL-M User's Manual
3U

14.1.6 Execution of data link

Turn on the power of the intelligent device stations first, turn on the power of the master station, then start the
data link.

14.1.7 Confirmation of operation by LED indication

The figures below show the LED indication status in the master station and the intelligent device stations
while the data link is normally proceeding.
• LED indication in the master station
Make sure that the LED indication status is as shown below.
• LED indication in the intelligent device station (FX
Make sure that the LED indication status is as shown below.
182
14 Example of Communication between Master Station
The unit is normal.
Data link is normally proceeding.
Data is being transmitted.
Data is being received.
-64CCL)
3U
The unit is normal.
Data link is normally proceeding.
Data is being transmitted.
Data is being received.
14.1 When Remote Net Ver. 1 Mode is Used
: On
: Off
: On
: Off

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fx3u-16ccl-m

Table of Contents