Real Good Toys Victorian Painted Lady Instructions Manual page 19

Table of Contents

Advertisement

Instructions for kit #JM-4600
29. Tape together a set of Top Bay Walls (1
groove) Glue and tape the Top Bay Walls to the walls and to the
underside of the Gable Floor.
Adjust the points to match the lower walls so the Top Bay Walls
will be straight above them (review Illus. #21C) and the corners of
the Top Bay Front line up with the corners of the Mid Bay Front.
Use one of the largest Window Panes as a square against a 'Bay
Vertical, Corner' to line up the corners of the Bay Walls.
Corners line up
Top Bay Walls
Points are
the same
Temporary use of the Bay Vertical,
Corners - Don't glue them here
30. Draw Shingle Guidelines on the Left Roof, Right Roof,
and the Gable Roofs. The first Guideline is one shingle-length (1
from the bottom edge (the top edge is beveled).
The rest of the Guidelines are 1" apart.
Draw all the Guidelines on the
Tower Roofs 1" apart
Tower Roofs
Gable Roofs
1"
1
/
" tall, no
2
Illus. #29
right bay
Points are
the same
Let the glue dry
1
/
")
4
Bevels are on the inside of the Roofs (face down)
Right Roof
1"
1
1
/
"
4
Walls and Floors (1) page 19
This drawing may print differ-
eently from the layout - confirm
the measurements before draw-
ing your shingle guidelines
Left Roof
1"
1"
1"
1"
1"
1"
1"
1"
One
Shingle
Length
Guideline
Measure

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jm-4600

Table of Contents