Page 2
See www.dhbuilder.com for photos of this Lighthouse under construction LH100 Lighthouse and JM122 Keepers House Each sold separately...
Page 4
Rails Assemble the Rails Second-coat the paint after 1. Paint (the first coat) and sand the Rails before as- the Railings are assembled sembly. Wipe any paint out of the grooves, and do not paint the Rail ends at all. 2.
Page 8
See: www.dhbuilder.com for lighthouse assembly photo galleries Cross section of Entryway from the side Front ” Foundation Step Floor www.dhbuilder.com has lighthouse assembly photo galleries...
Page 9
Pre-assembly of 4 wall sections makes contrlol of all the parts easier Alternate technique: build around 7” bowl and tighten with 3 wraps of string pulled thru a loop in the end Continue without stopping.
Page 10
3 ‘rounds of string pulled thru a loop is easier to control than rubber bands Let the glue dry.
Page 11
Cut Banding: Follow the seem to get the perfect angle...
Page 13
Cut from Rail material and ” Stripwood Cut and paint rungs for the Ladder from ” Stripwood. Assemble the Ladder following the diagram...
Page 15
Detail photos of an LH100 with optional shingles...
Page 16
This LH100 has optional Shingles and Door Knob...