Page 2
See www.dhbuilder.com for photos of this Lighthouse under construction LH100 Lighthouse and JM122 Keepers House Each sold separately...
Page 4
Rails Assemble the Rails Second-coat the paint after 1. Paint (the first coat) and sand the Rails before as- the Railings are assembled sembly. Wipe any paint out of the grooves, and do not paint the Rail ends at all. 2.
Page 8
See: www.dhbuilder.com for lighthouse assembly photo galleries Cross section of Entryway from the side Front ” Foundation Step Floor www.dhbuilder.com has lighthouse assembly photo galleries...
Page 9
Pre-assembly of 4 wall sections makes contrlol of all the parts easier Alternate technique: build around 7” bowl and tighten with 3 wraps of string pulled thru a loop in the end Continue without stopping.
Page 10
3 ‘rounds of string pulled thru a loop is easier to control than rubber bands Let the glue dry.
Page 11
Cut Banding: Follow the seem to get the perfect angle...
Page 13
Cut from Rail material and ” Stripwood Cut and paint rungs for the Ladder from ” Stripwood. Assemble the Ladder following the diagram...
Page 15
Detail photos of an LH100 with optional shingles...
Page 16
This LH100 has optional Shingles and Door Knob...
Need help?
Do you have a question about the New England Lighthouse and is the answer not in the manual?
Questions and answers