Rlds Installation; Rlds - Installation Considerations; Warnings And Cautions; Inspection - Emerson RLDS Installation And Operation Manual

Refrigerant leak detection system
Table of Contents

Advertisement

3

RLDS Installation

Solenoid
Connections
(this side)
Figure 3-1 - RLDS Diagram
Standard accessories needed for a four (4)-point Sys-
tem:
Accessory
Five (5) Line-End Filters 
(Assembly)
Charcoal Filter
RLDS Instruction Manual
Table 3-1 - RLDS Accessories and Part Numbers
3.1. RLDS - Installation
Considerations

3.1.1. Warnings and Cautions

WARNING: Explosion hazard! Do not mount
or operate this equipment in an area that may
contain or in the presence of flammable
liquids, vapors, or aerosols. Operation of any electrical
equipment in such an environment constitutes a safety
hazard.
WARNING: Drilling holes in the RLDS
enclosure may damage the unit and will void
the warranty. Please use the knockouts
provided for electrical connections.
6 • RLDS I&O Manual
Display Screen
Alarm Light
(Red)
System Fault
Light (Yellow)
Monitor ON
Light (Green)
Part Number
275-0300
275-0275
026-1309
WARNING: Shock hazard! Always
de-energize the power supply before working
on the interior of the equipment.
CAUTION: The RLDS contains sensitive
electronic components that can be easily
damaged. Do not to touch nor disturb any of
these components.

3.1.2. Inspection

The RLDS has been thoroughly inspected and 
tested prior to shipment from the factory. 
Nevertheless, it is recommended that the monitor be
re-checked prior to installation. Inspect the outside of
the enclosure to make sure there are no obvious signs
of shipping damage. Open the enclosure and inspect
the interior of the unit for loose components that may
have become dislodged during shipment. If damage is 
discovered, please contact Technical Support for 
assistance (770-425-2724).

3.1.3. Monitor Location

The RLDS should be centrally located in the 
facility and should be easily accessible for visual
monitoring and servicing. Intake sample lines can be
up to 1200 feet (365 meters), but it is important to 
remember that sampling cycle time is proportional to
the total number and length of individual sample
lines.
Dirt, grease, and oils can adversely affect the 
operation of the RLDS. The monitor should be 
installed out of direct sunlight in a clean, dry area that
is not subject to temperature or humidity extremes.
Installation of the monitor in a mechanical room is 
acceptable provided reasonable environmental 
conditions exist. If there is a question, consider 
installing the unit outside of the mechanical room in a
cleaner area of the facility. The location should allow
the monitor to be easily accessible for visual 
monitoring and servicing.
3.2. RLDS Mounting
Instructions

3.2.1. Screw Locations

The RLDS should be installed plumb and level and
securely fastened to a rigid mounting surface. The 
enclosure utilizes keyhole mounting brackets 
026-1309 Rev 8

Advertisement

Table of Contents
loading

Table of Contents