Battery Module Wiring; Dc-Cabling - Alpha ESS Storion-T30 Installation, Operation & Maintenance Manual

Energy storage system
Table of Contents

Advertisement

Your Smart Energy
Warning: All of the battery group number in the same battery cluster shall be the
same. When you are installing batteries, please handle gently to avoid scratches
because of the heavy weight of the battery.
Step 4: Use the screws and the grounding joint
rings in battery packing list to fix every battery on
the cabinet.
Note: Suggested screw torque: 5N· M.
Step 5: After completing battery installation, check that the battery is installed in the correct
sequence.

Battery Module Wiring

DC-Cabling

The inverter is shipped with the HV900112 in the cabinet.
Power cables to be connected from HV900112 to Inverter as shown in Figure 4.6.
Please connect other DC power cables between Batteries, Batteries and HV900112 as shown
in Figure 4.6. The short cable links for the Battery modules can be found in the Parts Packing
list. The long cables are shipped by being tied to the BESS cabinet.
__________________________________________________________________________________
Page 30 of 59
Installation
Alpha ESS Co., Ltd.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents