__________________________________________________________________________________ - Alpha ESS Storion-T30 Installation, Operation & Maintenance Manual

Energy storage system
Table of Contents

Advertisement

Your Smart Energy
Routine Maintenance
2. Check if any cables/wires are showing signs of ageing or have been damaged.
3. Check whether any cable securing ties have fallen off within the system enclosure.
4. Check to confirm whether all cable terminations are secure, and terminal connections haven't
got any signs of overheating.
5. Monitor the voltage, temperature and events on the EMS module, and see if the BLMU's
collection line, connection terminal, terminal block, communication line connection are secure
and not damaged.
6. Check whether the EMS module of the system equipment, monitoring system and other
related equipment are the correct component/module, correctly fitted and not damaged at all.
7. Check that the grounding/bonding of the equipment is adequate, the grounding/bonding
resistance should be less than 4 ohms.

__________________________________________________________________________________

Alpha ESS Co., Ltd.
Page 55 of 59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents