About This Document; Used Symbols And Signal Words; Terms And Abbreviations - Leuze electronic CSL710-T05-1280.A-M12 Original Operating Instructions

Switching light curtain csl 710 series
Table of Contents

Advertisement

1

About this document

These original operating instructions contain information regarding the proper use of the CSL 710
switching light curtain series. They are included in the delivery contents.
1.1

Used symbols and signal words

Table 1.1:
NOTE
Table 1.2:
Main Settings
Digital IOs
1.2

Terms and abbreviations

Table 1.3:
DTM (Device Type Manager)
IO
FB (First Beam)
FDT (Field Device Tool)
LB (Last Beam)
TIB (Total Interrupted Beams)
n
IODD
GUI (Graphical User Interface)
PLC
Response time per beam
Leuze electronic
Warning symbols, signal words and symbols
Pay attention to passages marked with this symbol. Failure to observe the pro-
vided instructions could lead to personal injury or damage to equipment.
Signal word for property damage
Indicates dangers that may result in property damage if the measures for dan-
ger avoidance are not followed.
Symbol for tips
Text passages with this symbol provide you with further information.
Symbols for action steps
Text passages with this symbol instruct you to perform actions.
Operating on the display
Bold text
Indicates that this field is currently selected and appears highlighted in
the receiver display.
Normal text
Indicates that this field is not currently selected (is not highlighted in the
receiver display).
Terms and abbreviations
Software device manager of the sensor
Input Output
First beam
Software frame for management of device managers (DTM)
Last beam
Total of interrupted beams
Number of all logical beams of a light curtain; dependent on the
selected measurement field length and resolution as well as the
beam mode (parallel- / diagonal- / crossed-beam scanning)
IO Device Description (IODD file for IO-Link interface)
Description of the device for the control
Graphical user interface
Programmable Logic Control
(corresponds to Programmable Logic Controller (PLC))
Length of time for the evaluation of a beam
CSL 710
About this document
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Csl710-r05-1280.a/l-m12

Table of Contents