Teaching Via A Control Signal From The Control - Leuze electronic CSL710-T05-1280.A-M12 Original Operating Instructions

Switching light curtain csl 710 series
Table of Contents

Advertisement

Level 0
Level 1
Main Settings
Commands
Operational setting
 Select Main Settings > Operation Settings > Power-Up Teach > Active.
8.2.2

Teaching via a control signal from the control

Teach input (Teach In)
This input can be used to perform a teach following initial commissioning, change of the alignment or
during operation. During this procedure, the transmitter and receiver adjust themselves to the maximum
function reserve according to the distance.
To trigger a teach, a pulse must be applied on connection X1 on the receiver IO1 = pin 2 (factory setting)
for longer than 20 ms ... but less than 80 ms.
Depending on the configuration (PNP or NPN), this corresponds to the following signal response:
High
Low
1
Figure 8.5:
Control signals for line teach with PNP configuration
High
Low
1
Figure 8.6:
Control signals for line teach with NPN configuration
Performing a teach via the line input
Prerequisites:
• The light curtain must be correctly aligned (see chapter 8.1).
• A connection must be established between PLC and the line input (teach-in).
 Send a teach signal to the teach input via the control (see chapter "Teach input (Teach In)" for the data)
to trigger a teach.
The display on the receiver control panel shows
Wait...
Following a successful teach, the display switches back to the bar graph (alignment mode).
Leuze electronic
Level 2
Filter depth
Beam mode
Function reserve
Blanking teach
Power-Up Teach
Teach is performed here
Teach is performed here
Starting up the device - Basic configuration
Description
Teach
Reset
Not active
Active
1
1
CSL 710
Factory settings
48

Advertisement

Table of Contents
loading

This manual is also suitable for:

Csl710-r05-1280.a/l-m12

Table of Contents