The system may shut down itself to protect the batteries from over discharging in
responding to the large loads. To restart the system, the sequence should be:
Pic 6. Restart the system
More information can be found in M4860/M48100/M48112-P user manual.
5. EMS Configuration
5.1 Running Page
1
2
3 4
Pic 7. Running Page
5.2 History & Basic Info
Pic 8. History
"History "page shows the PV, loads and
SOC data within last 24 hours. Can also
choose a certain date or time period to
check the history data.
Step 1 Turn off all the battery modules and restart them;
Step 2 Open the front door and remove the front panel;
Caution, do not touch any metal parts of the inverter
to avoid potential electrical shock.
Step 3 Press the button "ON" on the inverter shortly to
light on the screen and then press it again for over 5 sec
until the picture as shown on left appears on the screen.
Step 4 Screw the front panel back on and lock the front
door.
The information in running page includes:
1: From top to bottom: PV size, battery capacity, inverter
size, self-consumption rate and self-sufficient rate.
2: System Status (Normal/Warning/Fault)
3: Internet Status (Online/Offline)
4: Running Diagram
Pic 9. Basic Info
"Basic Info" shows the current version of each
component and also reminds you if new
software is available.
- 03 -
1 2