SERVICE SCHEDULE AND COMMISSIONING
New machine preparation
- Check the wheel nuts are tight.
- Check nuts and bolts are tight.
- Check brake adjustment and efficiency.
- Check the tyre pressures cold.
- Check operation of the lights, flashers, horn, and brake light.
- Check the different warning lights work.
- Carry out a road test.
Electricity
All components of the electrical system are powered with 12 volts DC
The battery must not be disconnected while the engine is running and the voltage must be at least
8.5 volts for the ECU to function and enable engine starting.
12
Reproduction or translation, even partial, is forbidden without the written consent of Peugeot Motocycles