Tatu Marchesan SDA CP Instruction Manual page 31

No-till seed drill
Table of Contents

Advertisement

SET
SET
SET
SET
SET -UP INSTRUCTIONS
- Before starting seeding, make a general inspection in the seeder, tightening all
the bolts and nuts, also, verify the conditions of the pins and cotter pins, to avoid future
damages. Repeat this operation after the first day of work.
Important: - ONLY FILL UP THE SEEDER IN THE WORKING SITE.
- NEVER TRAVEL AWAY WITH THE SEEDER LOADED WITH EXCESS.
- Check the tires inflation pressure keeping the same calibration in both. For
SDA CP of 15 and 23 rows, tires 12.4/11-28. For SDA CP of 23 and 29 rows, tires 14.9/
13-28. Calibrate both with 30 PSI.
- Also check for the presence of any strange object inside the hoppers, which may
damage the metering mechanisms.
- Lubricate all the grease fittings properly.
Note: THE TIRES MUST HAVE THE SAME DRAWING AND THE SAME CALIBRATION OF
PRESSURE.
The Seeder SDA CP model operate with larger efficiency in the range of 5 until 8
km/h. It is necessary to keep the constant speed in all the seeding.
Note: HAVE THE COMPLETE INFORMATION ABOUT THE SITE BEFORE INITIATING THE
SEEDING OPERATION. MAKE A LANDMARK AT DANGEROUS PLACES OR
OBSTACLES.
-UP INSTRUCTIONS
-UP INSTRUCTIONS
-UP INSTRUCTIONS
-UP INSTRUCTIONS
Procedures Before the Seeding
Ideal Speed of Operation
30

Advertisement

Table of Contents
loading

Table of Contents