Power-up routine

Make sure the power at the wall connection point is switched ON.
Wired connection
1. Either; position the ADTS Touch on the docking connector of the ADTS, or connect the ADTS
Touch to the ADTS using the umbilical cable connector.
2. Set the On/Standby Switch on the front of the ADTS to ON.
The test set performs a self test, resulting in a test set status indication "Pass" or "Fault".
If the self test fails (red "Fault" indication), or for any other reason the test set is considered to be
unserviceable, contact GE and return the test set to the GE or GE approved service centre.
During the "Power-up" routine, the following screen is displayed showing a "Progress" bar at the
bottom of the screen:
The "ADTS power-up self test" screen is displayed for a short time followed by the "Dashboard".
Wireless connection
To establish a wireless connection:
1. Ensure that the ADTS Touch is not positioned on the docking connector of the ADTS, or
connected to the ADTS using the umbilical cable connector.
ADTS542F/552F/553F/554F User Manual
Test set status indications:
No LEDs
Yellow
Green (flashing)
Green/Red
Table 3-1 Test set status indications
Figure 3-1 ADTS power-up self test screen
OFF
Standby
Self test in progress
Pass/Fault
K0553 Revision C