3-2 Power-Up Routine - GE Druck ADTS 2 Series User Manual

Druck air data test systems three-channel test set
Hide thumbs Also See for Druck ADTS 2 Series:
Table of Contents

Advertisement

Druck ADTS 2XX User Manual

3-2 Power-up routine

Set the power supply switch to ON.
Check that the screen shows the correct display for a successful power-up.
Check:
the pump operates.
the power indicator lights
air discharges through the water drain.
Connect the cable to the AHT communication connector on the ADTS 2XX.
Check that the screen shows the correct display.
Check that the ADTS 2XX screens show the correct display messages (see below).
Note:
This Windows
K0451 Issue No. 1
®
based facility hides many of the normal features of Windows
F
3-1 P
IGURE
Front panel or advanced hand terminal screen
DRUCK ADTS 2XX
DRUCK ADTS 2XX
Three Channel
Air Data Test System
-
D
OWER
UP
ISPLAYS
®
.
Main Menu Screen
12

Advertisement

Table of Contents
loading

Table of Contents