On completion of the EPR checks, select "Go to ground" and wait for the AT GROUND message to
be displayed, see also section 3.8, "Go To Ground". Refit the pitot and static blanking caps.

3.12 Test sequence

The test sequence mode allows you to run tests, using the ADTS, based on previously defined and
stored test sequence data.
1. On the "Dashboard", swipe across to select "TEST SEQUENCE". The "Test sequence" screen
appears showing the last used test sequence title (1).
1
2. Touch the test file browse icon (2). The "Tools" main menu opens with "Test sequences"
highlighted and a list of available test files.
K0553 Revision C
F
3-24 T
S
IGURE
EST
EQUENCE SCREEN
2
3
3-35