FX2N-64CL-M CC-Link/LT Master Block
5.1

Installation

The FX
-64CL-M can be attached via DIN rail or attached directly with screws.
2N
The installation procedure in each case is described below.
5.1.1

Installation direction

• Do not install the master block on floor surfaces, ceiling surfaces or in a horizontal direction.
If the master block is installed in such a way, its temperature may rise.
Install the master block vertically on wall surfaces as shown in the figure below.
• Secure a space of 50 mm (1.96") or more between the master block and other equipment or
structures. Keep the master block off high voltage cables, high voltage equipment and
power equipment as much as possible.
5.1.2

DIN rail installation

Align the upper DIN rail installation groove in the module with the DIN rail 1), and press the
module in that position 2).
When removing the module, pull the installation hook downwards 3), then remove the module
4).
Installation
1)
Applicable DIN rail
5.1.3

Direct installation

Fix the FX
2N
and lower) mounting holes provided on the master block.
Install the FX
each unit.
Applicable screw
Removal
3)
2)
TH35-7.5Fe and TH35-7.5AI (conforming to JIS C2812)
-64CL-M on to the panel surface by tightening M4 screws inserted in two (upper
-64CL-M and other units so that a clearance of 1 to 2 mm is assured among
2N
M4 height: 16mm(0.63") or more (Tightening torque range: 78 to 108 N⋅ ⋅ ⋅ ⋅ cm)