Step 8: Complete Final Antenna Mounting Requirements - Primex XR 5 Watt Install & Operation Manual

72mhz synchronized time solution, xr series
Table of Contents

Advertisement

Step 8: Complete Final Antenna Mounting Requirements

During this step, you will weatherproof and secure the cabling, verify all connections are secure, and caulk any exterior holes.
1. Weatherproof the antenna connection using GelWrap kit supplied.
2. Secure the GPS cable and LMR 400 cable to the building and mast.
3. Leave a drip loop where both cables enter the building to prevent water from entering the building.
4. Use UV resistant zip ties to secure the cables to the mast and building.
WARNING
Do not zip tie the GPS cable to the LMR 400 cable. These two cables must be 2 inches (5.08 cm) apart at all times, with the
exception of the point where they enter into the building.
5. Verify all nuts and bolts in the mounting hardware are secure.
6. Caulk all exterior holes.
7. Secure and tie wrap all indoor cables.