Measurements - Days Casa Med Classic FS Operating Manual

With dewert drive systems. nursing beds
Table of Contents

Advertisement

NURSING BEDS

12.6 Measurements

Some countries in the European Union have a legal requirement to carry
out the measurements listed below.
The nursing bed operator is responsible for determining the appropriate
national regulations.
All measurements described below may only be carried out by expert
trained personnel and with the use of suitable measuring instruments.
Any faults noted must be reported to the responsible person
immediately and rectified.
Hazards due to electrical and mechanical faults!
• Always remove faulty nursing bed from operation and secure
them against unauthorised use (remove mains plug).
Accident hazard!
• It is imperative that you always rectify any faults which could
influence the function and safety of the nursing bed
immediately.
Description
The following measurements must be carried out in
accordance with DIN VDE 0751 :
Earth conductor resistance (only Class I devices)
Equivalent leakage currents
Information about measurement of equivalent leakage currents:
Typical value:
Measurement locations: shorted-out power plug (L+N) against...
58
Issued: 25.07.2007
< 20 µA
1.) ...metallic lift motor parts (bed end motors)
2.) ...blank metallic bedframe locations
(bolts etc.)
Casa
Med Classic FS
Testing plan
Assessment
OK
defective

Advertisement

Table of Contents
loading

Table of Contents