Pedestal Or Wall Mounting The Node - Cisco GS7000 Installation And Operation Manual

Super high output intelligent node
Table of Contents

Advertisement

Pedestal or Wall Mounting the Node

8 Continue to

Pedestal or Wall Mounting the Node

Two mounting holes on the housing allow pedestal or wall mounting.
Follow this procedure for pedestal or wall mounting.
Warning
• Be aware of the size and weight of the node while mounting. A fully loaded node weighs nearly 50
• Ensure that proper handling/lifting techniques are employed when working in confined spaces with
• Failure to observe these warnings can result in serious injury or death.
1 Remove the cover of the pedestal.
2 Remove the self-tapping bolts from the strand clamps, if previously installed, and set the bolts and strand
clamps aside.
3 Position the node horizontally in the enclosure and allow for free flow of air around it. Inadequate airflow
could cause the node to exceed thermal parameters. Line up the bolt holes on the bottom of the housing
with the mounting holes on the pedestal bracket provided by the pedestal manufacturer.
Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide
20
Fiber Optic Cable Installation, on page 21
lbs (22.7 kg).
heavy equipment.
and
RF Cable Installation, on page
Installation
27.

Advertisement

Table of Contents
loading

Table of Contents