Checking Combustion Parameters - Beretta EXCLUSIVE GREEN CSI 16 User Manual

Table of Contents

Advertisement

Programme the "Gas type" parameter and adjust the boiler as described in the
"Adjustments" chapter.
The boiler may only be converted by qualified staff.
After conversion, adjust the boiler again as shown in the relative paragraph
and apply the new rating plate contained in the kit.

20 - CHECKING COMBUSTION PARAMETERS

To ensure the product remains in perfect working order, and to comply with
current legislation, systematically check the boiler at regular intervals.
To analyse combustion, proceed as follows:
- access the CALIBRATION & SERVICE phase by setting the password as
indicated in chapter "Adjustments"
- insert the analyser probes in the designated positions on the air chamber,
after having removed screw B and cap C (Fig. 1.20)
- make sure, in the HH and LL parameters, that the CO
with those indicated in the table. If the value displayed is different, proceed to
modify it as indicated in the chapter "Adjustments", in the sections for
parameters HH and LL
- carry out the combustion analysis.
Subsequently:
- remove the analyser probes and close the combustion analysis sockets with
the designated screw
- close the instrument panel, reassemble the cover and boiler shell, following
the procedure described for dismantling it in reverse order.
The fumes analysis probe must be fully inserted.
IMPORTANT: the function that switches off the boiler when water temperature
reaches a maximum of about 90°C is still enabled during the combustion analysis
phase.
values correspond
2
ENGLISH
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents