Chapter Eight Server Installation Guide; Cabinet Preparation - Inspur NF5270M3 User Manual

Table of Contents

Advertisement

Chapter Eight Server Installation Guide

● The Guide will help you to understand how to install Inspur 2U server in Inspur
server cabinet or compatible standard industrial cabinet.
● After installing the server in the cabinet according to the Guide, please refer to
other accompany material to acquire more application directions.
● Please uncover the fi lm on the cover plate of the server, and then power up to
use it.
● Pictures in the Guide just for reference, please give priority to real products.

8.1 Cabinet Preparation

Angle rail adjustment: in order to guarantee the 2U server can be installed in the
cabinet normally, the clearance between the front and rear part of the angle rail should
be adjusted to be at least larger than 740mm.
Leveling cabinet: the cabinet must be installed in a stable place. Adjust the
four support feet at the bottom of the adjustment cabinet to make the cabinet stable
on the ground. Meanwhile, dismount the cabinet door for convenience of guide rail
installation.
Cabinet grounding: to avoid electric shock, a grounding device must be installed
in the cabinet. If the server power line is installed in the power socket, which constitutes
a portion of the cabinet, grounding should be properly provided for the cabinet. If the
server power line is inserted into the power socket in the wall, the grounding device
in the power socket just provides grounding for the server, and then proper grounding
protection for cabinet and other internal devices should be provided. We recommend
you to use the cabinet specially designed by Inspur for the server. If so, the internal of
the cabinet should be already grounded. Please don't change the ground joint in the
cabinet unless it is of absolute necessity.
Temperature: if installed in the cabinet, the operation and working temperature of
the server can't be lower than 5 ℃ and higher than 35 ℃ .
Ventilation: the cabinet used by server cluster must provide enough wind current
for the front of the server to ventilate, and must ensure 4100Btu heat discharge per
hour. The cabinet selected by the cluster and ventilation condition must correspond
with requirements of the server.
58

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents