Download Print this page
Inspur NF5280M6 Installation Manual

Inspur NF5280M6 Installation Manual

Rack-mounted server (integrated rail kit)
Hide thumbs Also See for NF5280M6:

Advertisement

Quick Links

Warnings!
Watch out for the scratches that may be caused by the cabinet, chassis or rails.
Be aware of electric shock when installing the servers into the cabinet in use.
DO NOT block the vents on the server during installation, especially the vents on the front
and rear of the server.
Remove the protective film from the chassis before installing servers into the rack.
For proper ventilation, leave a minimum space of 15cm between two servers.
For easy access of the front and rear ports and cabling, leave a minimum space of 70mm
between the front side of the server and the inner side of the cabinet's front door, and
150mm between the rear side of the server and the inner side of the cabinet's rear door.
Always keep the air ba es in place to ensure proper air flow and avoid air turbulence in the
server room.
Installation must comply with local and regional electrical regulations. To reduce the risk of
personal injury, fire, or damage to the server, DO NOT overload the AC supply that provides
power to the rack.
Servers can only be deployed in dedicated cabinets with ventilation holes or specialized
cooling cabinets to avoid server failure from overheating as they are high power appliances.
In case of multiple-server deployment, always load from bottom to top and place the heavier
server on the lower bay.
DO NOT install devices beyond the cabinet's load-bearing capacity, power supply capacity
and heat dissipation capacity.
For devices ≥ 15kg, it requires at least 2 people.
15kg
For devices ≥ 30kg, it requires at least 3 people.
30kg
For devices ≥ 50kg, it requires at least 4 people.
50kg
Please keep this document for future reference.
PN
Rack-Mounted Server
Installation Guide
(Integrated Rail Kit)
V1.0

Advertisement

loading
Need help?

Need help?

Do you have a question about the NF5280M6 and is the answer not in the manual?

Questions and answers

Summary of Contents for Inspur NF5280M6

  • Page 1 Warnings! Watch out for the scratches that may be caused by the cabinet, chassis or rails. Be aware of electric shock when installing the servers into the cabinet in use. ● DO NOT block the vents on the server during installation, especially the vents on the front and rear of the server.
  • Page 2 Rail 1 Rack-Mounted Server Installation Guide V1.0 Removing the Rails from the Server Rail-Kit Contents Repeat Step 1 and Step 2 for the other rail-kit. NOTE: The front end and rear end of the rail, and the two rails MUST be Open both handles on the front of the server, and then loosen the two Rear Bracket installed at the same height.
  • Page 3 Rail 2 Rack-Mounted Server Installation Guide V1.0 Identifying the Rail Kit Contents Removing Rails Repeat steps 1 and 2 to install the other side. And pull the inner rails out of the rack until they lock into place. Notice: Keep the left and right rails on the same level. Rail Kit is assembled by inner rail, middle rail and outer rail.
  • Page 4 Rail 3 Rack-Mounted Server Installation Guide V1.0 Rail-Kit Contents Open both handles on the front of the server, and then loosen the two Align the pins on the front bracket to the front of the rack. Press the locking thumb screws. latch as indicated by arrow ①, and then insert the pins as indicated by arrow ②...

This manual is also suitable for:

Nf5466m6