Quick Start-Up Guide; Overview; Installation - ABB REPL-01 User Manual

Ethernet powerlink adapter module
Table of Contents

Advertisement

Quick start-up guide

Overview

Installation

Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
This chapter presents the steps to take during the start-up of the
REPL-01 Ethernet POWERLINK Adapter module to set up
communication between a PLC and REPL-01, allowing the drive
to be controlled from the fieldbus.
The parameter settings are given for ACS800 and ACS550 drives.
The PLC used in the example is a B&R X20 CP1485, and B&R
Automation Studio PC software is used to configure it. The
information should, however, be easily adaptable for use with
other PLCs as well.
WARNING! Follow the safety instructions given in this manual and
the Hardware Manual of the drive.
This section describes how to physically connect and configure
the equipment.
1. Set the node ID with the DIP switch S1 on the module. In this
example, the node ID used is 3, which is selected by flipping the
actuators 7 and 8 to ON position and the actuators 1...6 to OFF
position.
2. Mount the REPL-01.
• Insert the REPL-01 into its specified slot in the drive (SLOT2 for
ACS550, SLOT1 for ACS800).
• Fasten the two screws.
3. Connect the module (connector X1 – NETWORK) and the PLC
(connector IF3 – EPL) to the hub with Ethernet cable. Avoid
parallel runs with power (e.g. motor) cables. Use straight-through
Quick start-up guide
13

Advertisement

Table of Contents
loading

Table of Contents