Attaching The Base Unit To A Wall; Mounting Brackets; Screws And Wall Plugs; Connecting The Expansion Module (Optional) - Uponor Climate Control Zoning System II Installation And Operation Manual

Table of Contents

Advertisement

Attaching the base unit to a wall

The base unit is delivered in a kit that includes screws, wall
plugs and a mounting bracket.

Mounting brackets

Attach the mounting bracket to the wall using the screws and
wall plugs, then attach the base unit to the mounting bracket.
The figure below shows how to attach (A) and detach (B)
the base unit using a mounting bracket.
A
1
Figure 3-7: Attaching the base unit to a wall
Caution: Make sure the controller cannot slide
off the bracket if mounting it in any other position
than horizontal.
B
A
B
2
1
Climate Control Zoning System II installation and operation manual | Chapter 3 – Installing the base unit l 9

Screws and wall plugs

The figure below shows base unit mounting hole positions
and how to attach it to the wall using screws and wall plugs.
Figure 3-8: Attaching base unit with screws and wall plugs

Connecting the expansion module (optional)

The illustration below shows how to connect the expansion
module to the base unit.
Figure 3-9: Connecting optional expansion module
Important! Only one expansion module is supported
per base unit.
1 1 0
m m

Advertisement

Table of Contents
loading

Table of Contents